Guys,
how much runtime are you getting and with which venturi in a F11 in a truggy? I will be running it with a 2087 Tuned Pipe w/192mm Manifold. I am looking for more then 10 minutes if possible. I will probably doing the break in process this w-e.
Thanks
J-F