It has been a while so i thought i would give a little update.As things stand right now we should start moving dirt in about 1 month.Going to install a drain pipe and move about 30 loads of dirt.The plan for the drivers stand is to build it 6ft wide by 16ft long.It will have a roof on it so the sun will should not be an issue.
Is 4inch drain pipe ok for the track border?I think it is going to take about 1500ft if not more to line the track when its done.