R/C Tech Forums - View Single Post - The Tigre's Lair - The Sequel ...My Pit Trailer Project II
Old 06-27-2009, 10:47 PM
  #188  
El Tigre
Tech Regular
 
El Tigre's Avatar
 
Join Date: Aug 2008
Posts: 332
Default

I couldn't sleep so I decided to do some trimwork. I'm covering the exposed wood that was between the Slatwall and the ATP. I'm using 1in wide metal seaming that runs about $7. Here I'am doing the left side



Left side is done, now working on the right.



Now that's snazzy!! Right side is good



I'm about 5 in short on the left side but I know that I will need to buy some more, but it still looks good.



I decided to cover the exposed 2x3 framerails and the exposed hardwood on the cabinets with ATP. I still have a decent amount left and I may as well put it to good use.



Here I'am trimming the ATP for the 2x3s



Goes on smooth like butter. No muss no fuss



The ATP absolutely makes the 45 degree cuts on the counter stand out. DAMN!! I'm good!! Right side is hot



Left side is poppin



The 2x3s are done and I'm starting on the exposed cabinet hardwood



Left side is good



Right side looks good as well. NOW I'm done....Laminating the countertops is next. Stay tuned.

El Tigre is offline