Originally Posted by
Scott Fisher
So 8.5mm in about 30-35 mins? (warmup times included)
Brian Thomas started the 1/8TH scale main on 73 rears and lost about 4.5mm in 20 minutes plus the warm up and he drove the car hard.
BTW you looked good with the Shepherd car BTZ. (You looked good in sedan and GT too)