Originally Posted by
Danny/SMC
That would use up a decent amount of room which would reduce the packs capacity.
How much capacity would be required to go 8 minutes? Just curious
If a receiver pack is required anyway then if there were a creative way to get all the power plant stuff in a single (probably larger) package I think it would be a neat product for someone to come out with. Just an idea. Not sure if its feasible or possible. I guess the challenge would be to get the single package to still fit in existing 12 scales which I assume is where the probably lies.