Track Surface.
Because the intended facility was an Engineering Facility, a "re surface" is required because of the smoothness, or lack thereof, as well as some SERIOUS grease. At this stage, it will be brushed concrete, to a quality that would NOT CHUNK FOAMS, for those who choose to run them.