Originally Posted by
LloydLoar
I don't think we are talking about the same thing. Art and I are talking about the entire schedule being shifted forward so it would run from the 5th to the 11th rather than the 6th to the 12th. This would mean that the final Sunday (12th) could be used as a travel day, rather than having to use the Monday.
I realize that the folks people actually want to see at Worlds probably aren't worried about taking the Monday off of work, but for the rest of us this kind of stuff actually matters.
The dates were set in stone June 2013 so no possible changes