Originally Posted by
hyujmn
How do you have yours set up? I'm running an mt4 with a 1251 and my end points are 115/145 to get them even.
It's a little tricky, first step is to ignore the build manuals link length of 47mm, and aim to make one around 42mm, in my case that meant cutting down the ball joints in length, and also cutting the link rods threads down to half on each end.
After that it's about getting as close as you can to a perfect right angle off servo arm to link rod down to rack, with the Xray servo saver, use inner top hole, with servo saver still dead vertical, if using something else, adjust to suit.