Basically, all the jumps, tables, elevation changes, and rollers are now in place. We still need to get out and face the jumps and work on some landing areas. Hopefully we can get a roller on it soon and all that will be left is to lay the pipe. Rain will most likely determine how soon we can get out there and get it done. One way or the other, we will be racing at Cherry Valley soon