R/C Tech Forums - View Single Post - Call this a "Feasability Study" for opening a new track
Old 11-20-2012 | 02:03 AM
  #20  
kaan
Tech Regular
 
Joined: Jul 2011
Posts: 283
From: Denmark
Default

About the tubes for track edge.
A much better solution is to use rope. Big ship rope that is treated to last no matter how much water they get. These can be bought used with plenty of life left in them. The initial cost is much higher that drain tube, but it will last forever and maintenance is much easier.

Here is a video from my local track where you can see the ropes we use.
+ YouTube Video
ERROR: If you can see this, then YouTube is down or you don't have Flash installed.
kaan is offline