R/C Tech Forums - View Single Post - Tekno RC EB48 Thread
View Single Post
Old 05-31-2012 | 03:30 PM
  #601  
justag3
Tech Regular
iTrader: (7)
 
Joined: Aug 2008
Posts: 443
Default

Originally Posted by Cain
personally with a brand new kit, I try to spread the build out over a couple of days. Things that take fluids etc I may build on the first day, then do the rest of the chassis assembly the next. I think I do it this way as someone told me when I built my first kit that it was a good way to see if you have any slow leaks, etc.
Smart Idea
justag3 is offline