R/C Tech Forums

R/C Tech Forums (https://www.rctech.net/forum/)
-   Electric On-Road (https://www.rctech.net/forum/electric-road-2/)
-   -   Integy 16 x 3 Pro V2.5 (https://www.rctech.net/forum/electric-road/30403-integy-16-x-3-pro-v2-5-a.html)

rinkrat99 12-31-2003 09:19 PM

Integy 16 x 3 Pro V2.5
 
Hi all,

Does anyone have an idea as to what the runtime display means?

I have just charged a GP 3000 at 5A and the display read 470 after peaking.

Initially the pack was brought down to 0.9V / cell using a Smart II tray. So I would expect this to be that the 3000 pack actually has been charged to (3000mAH x 60 s /min) / 20 A === 540 seconds.

Is this fully charged?

Thanks


All times are GMT -7. It is currently 09:25 PM.

Powered By: vBulletin v3.9.3.8
Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.