Originally Posted by
Will27
I remember these photo but never could find the setup sheet that went with them. However, I do remember that Andy had added a bulk head along the CL of the chassis just ahead of the center pully bearings, drilled a hole in the top plate and secured the top plate to the new bulk head with one screw instead of the 4 around the center drive pully. If you look closely you can see the extra button head screw ahead of the drive pully. In the second photo it is near the negative battery wire. I don't recall discussion about raising the top deck, but it certainly could be there.