My goal is to do a big enough run to get hard anodizing done (50+ chassis) and make the batch minimum. I could do a smaller run (say 25) and the anodizing would cost double upping the cost to the buyer. I'll be considering a few possibilities tomorrow night at the track with the machinist (including no anodizing) to try getting these out as soon as I can, then finalize the ST and SC chassis shortly there after.