Community
Wiki Posts
Search

Shoe Goo Help

Thread Tools
 
Search this Thread
 
Old 07-16-2010, 12:22 PM
  #16  
Tech Master
iTrader: (34)
 
j_blaze14's Avatar
 
Join Date: Feb 2008
Location: Tampa, Fl
Posts: 1,692
Trader Rating: 34 (100%+)
Default

you have to let the body dry a full day before you shoo goo, it will stain or lift the paint cause it shrinks when it dries. if the body has dried 1 day and the paint lifts its not lexan paint or the body was not propperly cleaned prior to painting. i paint the body 1 day then let it dry, the next day i apply the drywall tape, its is sticky already but i dab ca in it to keep it down in the curves. then i apply a 1/8 inch thick layer of shoo goo over the tape and beyond it. i let it dry about 30 minutes then come back and spread it evenly like cake icing using a plastic spoon. i also put some around the sides of the body where the mud guards rub or where the pipe nipple rubs too. been using this for the last few bodies and had great success. some of the shoo goo eventually does start to peel off a few months down the road, i just ca it back down when it does. i'm on my second rc8t body to do this weekend and i ran the first body since january.
j_blaze14 is offline  

Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service -

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.